Home Latest 10 years of BRI: Parliamentarians visit Port Qasim Power Project

10 years of BRI: Parliamentarians visit Port Qasim Power Project

5 min read

ISLAMABAD, Feb.6 (INP): The Pakistan-China Institute (PCI) hosted a two-day delegation visit to CPEC projects such as the Port Qasim Power Project and the Thar Coal Mines at Sindh Electric Coal Mining Company, according to Gwadar Pro.

The delegation, led by Senator Mushahid Hussain Syed, included renowned parliamentarians from various political parties. Guo Guangling, CEO of Port Qasim Electric Power Company, hosted and welcomed the delegation on the first day and briefed them on the project’s unique operation.

The delegation was briefed on the most recent developments in CPEC’s energy sector, CPEC’ contribution to the Pakistani economy and the opportunities for interaction between Chinese investors and delegates.

The Port Qasim Power Project uses Super Critical Technology, which emits white smoke that is environmentally friendly. It is currently operational and connected to the national grid.

Senator Mushahid Hussain Syed thanked Power China and the people of China for trusting and investing in Pakistan, especially when Pakistan was facing the most deadly wave of terrorism.

“By constructing an economic corridor that promotes connection, construction, exploration of investments, and people-to-people contacts for connectivity, CPEC is aiming to better the lives of the people of Pakistan and China,” he added.

According to the data provided by PCI, 12 energy projects have been completed under CPEC in the last 10 years. In total, there are 36 active projects with an estimated cost of $27.5 billion. It is expected that many of these projects will be completed by 2023.

As per the data, the completed energy projects include the 1320MW Sahiwal Coal-fired power plant, 1320 MW Coal-fired power plant at Port Qasim, Karachi, 1320 MW China Hub Coal Power Project, Hub Balochistan, 660 MW Engro Thar Coal Power Project, 720 MW Karot Hydropower Project, AJK/Punjab, 100MW UEP wind farm Jhimpir, Thatta, 50 MW Sachal wind farm, Jhimpir, Thatta, 100 MW Three Gorges second and third Wind power project, 1000 MW Quaid-e-Azam solar park Bahawalpur, 50 MW Hydro China Dawood Wind Farm Gharo, Thatta, Matiari to Lahore 660 KV HVDC transmission line project, 4000 MW evacuation capacity, and 330 MW HUBCO Thar coal power project.

Author

  • FD News

    Financial Daily (FD) is an emerging media outlet providing news reports, analysis and features especially related to politics and economy. FD is currently one of the largest and most comprehensive private-sector information portals in Pakistan, providing its readers with apolitical, unbiased and fact-based news reports and analyses.

Load More Related Articles
Load More By Editor in Chief
Load More In Latest

Leave a Reply

Your email address will not be published. Required fields are marked *

Check Also

Pricing agreement inked for uninterrupted water supply to Gwadar Free Zone

Islamabad, Nov. 13 (INP): In a major boost for Gwadar Free Zone, an agreement has been ink…